Goodafternoon,
I’m enquiring about the following.
We currently have a Jira Align EPIC “Contractual Obligations FY’24”.
Under that EPIC we have numerous Jira Align Features.
This quarter, there is quite a bit of carry over work that will move into next quarter (which happens to be a new Fiscal as well ie FY25).
Usually when we Split features from 1 quarter (PI) to another, we Split Part 2 features is taking the same Parent EPIC.
In this case though the Split Part 2 Feature will need to reside underneath the new Align EPIC for FY25 namely “Contractual Obligations FY25”.
Example:
Align EPIC = Contractual Obligations FY’24”.
Align Feature = Feature-1
When splitting we get Feature-1-Split Part 1 and Feature-1-Split Part 2
When creating Feature-1-Split Part 2, it should be going under new Align EPIC Contractual Obligations FY’25”.
Again by default the Split doesn’t allow you to specify/pick/choose the parent EPIC.
Any way to overcome does or does this require manually changing the Parent Align EPIC for all those Splt Part 2 Features?
Thank you.