We have a 'Cancel' status in many of our JIRA Workflows. It is used when the team(s) have determined that a story / bug etc. is no longer needed.
I think we would want to capture this state in JIRA Align but using the 'Accepted' state doesn't seem right because it isn't really 'accepted' work.
I'm concerned that through the JIRA <--> JIRA Align connector this work will appear in JIRA Align (even linked to a Feature) and if it is canceled in JIRA (and work is naturally discontinued) any associated Features would now have Stories that are never resolved (creating issues with reporting, Misaligned issues etc.)
What is the suggested way of dealing with work from JIRA that has been 'Canceled'?