I have a project on JIRA with Epics and Stories. Some of them have links like:
- has to be done after
- is blocked by
- has to be done before
I would like to find a way to produce a report that would give a chain of tickets that follows that links to avoid blocking situations along the planning because one ticket A that depends of B is started in the wrong order.
Is there a way to do that?