I am using a Jira Structure, where the linkage is like an Objective is linked to a Feature, Feature to an Epic, Epic to a Story (Objective>>Feature>>EPIC>>Story)
I have been able to show this in Jira structure.. I am facing a challenge where an Objective(say A) is linked to other Objective (Say
and there the Features and epics linked to Objective B..
I am not able to show this linkage .. the flow stops at Objective B