Hi,
I'm at Dragon Stage 1, this stage specifies that you should use JIRA version 5.0 because later versions may not integrate properly with all other products. Does this mean actual version 5.0 or is it okay to use the latest 5.0.x or even the latest 5.1.x
Thanks for the help.