I recently installed tempo timesheets on our jira server.
After installing it, i am observing a strange behavior.
On the view issue screen, if i try to log work by clicking on the + sign on time tracking menu, it gives me a different screen to log work. This screen does not give me the different options to set the remaining time estimate e.g. Remaining estimate: adjust automatically, set to , reduce by etc.
How can i get my conventional log work screen back?
More over, if i use keyboard shortcuts i.e. dot and then L, it gives me two options for Log Work, which is confusing.
How can i fix this?