Say you have an large story sized 21 points and you break it down into smaller stories. Later, you break it down and you end up with a three 5 point stories and a 2 point story (total of 17 points) and that accounts for all the work included in that large story. What do you do with that 21 point story afterwards? Do you delete it? Do you change the points to 0?
I know all about breaking down stories so my question is really about the best way to use JIRA to reflect what we're doing so our metrics are correct.
Thanks!