How can i add the data from JIRA4.1 into JIRA4.3 and won't replace the exsited data.
You should be more specific:
Not directly, may be a bit of scripting using Jira Command Line interface? Or a bit of coding with SOAP or REST?
Are you means some plugins can do this?
Not plugins, via external programs or scripts that uses one of the above steps in Jira.
Btw, why not a direct upgrade an option? Is it that both the instances are running at the moment in parallel?
Yes. But i can't find out the right resolutions in the jira's documents.
The single project import will only work if both systems are the same version, also the project needs to be empty, it will not import into a project that contains any issues.
Dear Jozef Kotlár , thank you very much for your help, i think i have found the right way. I'll try it by your suggestion and tell you the result.
when i imported the test project, there was something wrong like this.
The backup project 'test' requires custom field named 'Last Closed Date' with full key 'com.tuncaysenturk.jira.plugins.jira-enhancer-plugin:last-closed-date'. In the current instance of JIRA the plugin is at version '2.4-SNAPSHOT', but this custom field was not installed in the backup data. You may want to create an XML backup with this version of the plugin installed.