I have setup a Jira Integration in OpsGenie. I basically have setup rules that whenever an alert is created it should also create a ticket in Jira. That I have been successfully able to carry out.
However, what I would like to do is assign the ticket so the current activate sprint. Can someone point to me which value should I use in the sprint dropdown to be able for the ticket to be added to the current sprint?