Hi all,
I planning to update our JIRA to latest version ( currently 6.2 ), since our license is expiring soon.
Right now I'm testing JIRA 6.2 in TEST environment.
I've installed JIRA 6.2 in TEST and connected it to copy of our production MySQL database.
After that I've installed all plugins and moved/applied all modifications, the attachments have been copied as well.
I'm planning to update JIRA with a fallback method.
But to be honest, JIRA 6.2 is about 2-3 times slower than 5.2.4 even it is only in test environment.
Any suggestions how to optimize the speed?
Or I missing something?
Or just the new version is slower?