I am migrating from JIRA 4.1 to Jira 5.2, and need to perform a XML Backup. Will I be able to perform an XML backup on a production JIRA system? The client would like their current version of JIRA (4.1) to stay up while they test the newest one out (5.2). Let me know. Thanks!