I have a workflow that includes a "build - test - rebuild" loop possible, and I would like to capture date/time and tag/comment field data for each iteration without losing historical loops. This would be used in the future reporting, by being able to report that a product was "rebuilt" 12 times, over X number of days, with 7 different tags, etc. The issue I am having now is that when you transition back to the "rebuild" status, the date stamp is overwritten, rather than concatenated.