I am trying to find the following to determine whether we can use Jira Control Chart as a reliable cycle time measure:
- What is the formula used for calculating Average cycle time in Jira Control Chart (the red line), and
- When a story is tagged as being Blocked, how does that impact the calculation? i.e. is Blocked time being included in the cycle time calculation or is it excluded because work is not in progress?
Thanks for any help anyone can provide!