Dear Community,
I want to write an effector to solve the following problem:
I want to run the effector so that it copies and pastes a field value from an item to another item in another project. Both items are linked over one field value.
Example.
Project 1
Item A:
Liked field value: x
Value points: 200 <-- I want to copy and paste this value with an effector to Item B in Project 2 with an effector.
Project 2
Item B:
Linked field value: x
Value points: (Empty)
Best Regards