Hi Team,
When creating reports with Jira (control diagram) and checking for cycle times, I sometimes get results like 7w 5d 5h when I explicitly exclude workfree days (corresponding checkbox not checked). How is this possible? In the example it should read 8w 0d 5h since 1w = 5d = 24h.
Please refer the below attached screenshot:-


Highlighted time should show 2w 1d 22h.
Thanks