Hi dear atlassian community,
I want to build a perfect Roadmap connecting different project. I want to build a main project with sagas and connect these sagas to different epics from different project and then let me show the hierarchy in the Jira Roadmap.
How can I link a Saga with the Epic of another project? I tried the "link field" but nothing happened in the roadmap.
Thank you very much!
Cheers,
Maria