Hello,
I have set up a Bamboo build plan that requires all jobs/stages to be run on the same physical machine (IE they depend on each other). When they are not, the builds fail. Is there any way to specify on a build-level that the jobs must run on the same physical machine? We use ELASTIC agents here, so we can't assume the hostname. I understand the Agent Matrix and Capabilities and all that, but this problem is not solved by specifying a capability since multiple instances of the ELASTIC agent will all have the same ones. Thanks!