
Hello, I want to create multiple sub-task with story-point, but when I use the statement such as `- [FE]Account ID Configurations / cfield:"<span>storypoints</span><br>:2"`, the sub-task I create don't have stroy-point within it.
I wander what is the way to create multiple sub-task with story-point. Thanks a lot