https://www.loom.com/share/63814671990e479399a3ba4c6226739b
I've explained it in the video, but to summarise:
- I can move tasks out of sprints and the sprint point calculation doesn't update
- I can change the sprint capacity and the sprint automatically fills up the whole sprint (up to 705 SP - I mean I know we're over scheduled but that's way off!)
Basically just want it to tell me the total SP for each sprint based on what is scheduled in it. If an epic spans two or three sprints, I'd expect the SP to be spread evenly across those sprints (is that not the case?)
This is quite urgent as we really need to know our capacity and I thought I had it, but now I'm just very confused!