Hi,
I would like to use the same calculated fields defined in the system, but would like to modify the formula.
Currently, the current field, C = A * B. It applies to certain issues but has Global context.
I have my project's field configuration scheme, and I can edit the formula in my field configuration to be C = A + B. However, the calculated value still results in C = A * B.
Is there a way to do that?
Thanks.