I have two project.
A issue is belong to A project.
B issue is belong to B project.
I want to make the rule like the following.
Before changing Done workflow from A proj, checking the link which is connect B issue status.
If B issue is Done. A issue can be changed as Done.
But
If B issue is "in review", A issue can be not changed as Done.
How can I setup it? I already checked "Add Condition To Transition", but I fail to find it.