We are currently creating separate schemes for each project, so teams can configure it based on their requirements.
We would like to be able to give project admins the flexibility to modify their own project schemes. However, we cannot find a way to limit scheme changes by project.
Is there a way to give each project admin access to their own project’s configuration scheme without granting them access to other project schemes?