After I migrated about 3000 issues from Rally, now I have 100+ sprints (migrated from Rally Iteration) in the JIRA backlog, and all of them are above the actual issues in the backlog. This 100+ sprints also makes loading backlog very slow, and scroll down to see the actual backlog is even worse.
How can I resolve this?