I've just started a Jira trial to see if it fits within our organization but I am facing a (small) yet annoying problem related to the Eclipse MyLyn connector.
The Due date formatter is expecting `dd-MMM-yyyy`, however the jira Due date is expecting `dd/MMM/yy` but I can't seem to change this formatting.
I've found the following link: http://forums.atlassian.com/thread.jspa?forumID=46&threadID=46345 but I did not find such a file named `jira-application.properties` and the tip to alter the Team Repositories->jiraserver-properties->Additional Settings->Advanced Configuration was not fruitful as well because that is already set to `dd/MMM/yy`.
Update1: (forgot version information)
I've downlaoded the latest Jira connector available through the 'install new mylyn connector' and running Jira v5.1.7 (trial)
Update2:
I've just downloade dthe IDE connector through the eclipse marketplace. Still the same problem though. (I had re-created the repository in eclipse)