Hello -
I am in a tough situation regarding Issue linking. In my Jira instance I have an Issue that automatically creates 2 different linked Issues (on separate workflows) via post function early in my project. This works well.
Later in my workflow the main Issue, which is currently linked with 2 other Issues, creates a third linked Issue. With this third linked Issue I am trying to figure out a way to link this third Issue with my 2 existing Issues that are linked with my main Issue. Is such a configuration possible in Jira?
My apologies if I am not being very clear. The situation is a bit confusing. Any help would be much appreciated.