I am not sure what "mark as done" does to an Epic.
Every time when I "resolve" an epic with resolution "DONE", and then "close" it. The epic can still be seen in the left-hand panel of Backlog view. I know that I need to click the button on its top-right corner and choose "Mark as Done".
I am confused about the design. I have resolved and closed the epic, but I still need additional step/operation to "mark as done" to make it disappear in the list of left-handle panel of the backlog.
How can I save this operation?
Thanks a lot.