Hi
doing
1) added transition to open a create screen of another project (p2)
2) imported to have the values of the necessary fields in project 1
3) trying to do the transition from project 1 to p2 by filling the create screen.
Getting error message that validation error of the two required fields (though they are filled in)
What to check for to find why the field values are not taken as valid data?