Hi All, JIRA is new to me and I am not able to figure out this things. I'll elaborate by one example:
- If Tickets are: T-1 , T-2 , T-3 they can be swapped among easily.
- If Tickets are : (T-1 <subtask> T2(closed)) , (T-3 <subtask> T-4(closed))
The 2nd point Tickets can't be dragged like point 1.
Although, If there is:
T-1 , T-2 , (T-3 subtask TO T-4(closed)) ===> T-1 and T-2 can be swapped with T-3