You're on your way to the next level! Join the Kudos program to earn points and save your progress.
Level 1: Seed
25 / 150 points
Next: Root
1 badge earned
Challenges come and go, but your rewards stay with you. Do more to earn more!
What goes around comes around! Share the love by gifting kudos to your peers.
Keep earning points to reach the top of the leaderboard. It resets every quarter so you always have a chance!
Join now to unlock these features and more
The Atlassian Community can help you and your team get more value out of Atlassian products and practices.
The plan has Maximum number of concurrent builds = 1 but when using the trigger Repository pulling and Scheduled 1AM branches still build concurrently without any regard to the max number of concurrent builds being 1.
Any tips on how to reinforce this rule?
Do you mean it is a different branch plan that run at the same time?
The setting only limit concurrent build per branch plan. It does not limit the concurrent build between master plan and branch plan.
I see, thanks! Yes it was across different branches. Do you have any idea on how to limit concurrent builds per plan?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Feature request https://jira.atlassian.com/browse/BAM-12071