Create
cancel
Showing results for 
Search instead for 
Did you mean: 
Sign up Log in

Plan running concurrently even with max 1 concurrent

Thomas January 17, 2019

The plan has Maximum number of concurrent builds = 1 but when using the trigger Repository pulling and Scheduled 1AM branches still build concurrently without any regard to the max number of concurrent builds being 1.

Any tips on how to reinforce this rule?

1 answer

1 accepted

0 votes
Answer accepted
Foong
Atlassian Team
Atlassian Team members are employees working across the company in a wide variety of roles.
January 17, 2019

Do you mean it is a different branch plan that run at the same time?

The setting only limit concurrent build per branch plan. It does not limit the concurrent build between master plan and branch plan.

Thomas January 17, 2019

I see, thanks! Yes it was across different branches. Do you have any idea on how to limit concurrent builds per plan?

Foong
Atlassian Team
Atlassian Team members are employees working across the company in a wide variety of roles.
February 11, 2019
Like Steffen Opel _Utoolity_ likes this

Suggest an answer

Log in or Sign up to answer
TAGS
AUG Leaders

Atlassian Community Events