link item

Camila Gomes April 15, 2019

I linked history A with the one blocked by B.

In the active sprint, I can move history A even before starting B, even though it is locked.

Is there any way I can not let history move  A without ending B before?

Thanks

1 answer

0 votes
Jack Nolddor _Sweet Bananas_ April 15, 2019

Not natively,
However you can set up a condition on your workflow to check for the linked condition status using a third-party app (probably a PAID one)

Check:


https://confluence.atlassian.com/adminjiracloud/advanced-workflow-configuration-776636620.html#Advancedworkflowconfiguration-conditions

https://marketplace.atlassian.com/search?product=jira&query=workflow