Comments
-
You need to read the log file to see what is going wrong. But, this error is usually something on https://confluence.atlassian.com/jirakb/troubleshooting-jira-startup-failed-error-394464512.html - try those first, and if you still get the problem, you must read the log
-
The link times out for me. What does your log file say the error is? It should be telling you why it's failing - jira-home/logs/atlassian-jira.log
-
You can't change it in the GUI, and don't think you can do it with a simple add-on either. I think you need to embed some code in a velocity template that will say "#if (project = xxx) #then display our text #else JIRA default text" I suspect you can change the default JIRA text by translating it, but that would still be a…
-
I think you need to explain what this has to do with JIRA, there's nothing in the question that tells us where there's an issue with JIRA.
-
What does "never returns" mean exactly? Can anyone else get to issues? Another browser?
-
You don't. Boards have nothing to do with groups, they're based on drawing information from projects. If your board includes 6 projects and you're only an admin on 5 of them, you need to either drop project 6 from the board filter, or get yourself admin rights to it.
-
You have to have project admin rights across all the projects included in the board. Is that what you're missing?
-
Labels are enterable fields for users to enter arbitrary... well... labels. Your options are to add descriptions to fields, or add a plugin that provides "message" fields. The Jira Toolkit plugin does this.
-
Depends on how the estimates are done in the team or what the business wants. Some places ask a developer to fill in an expected date when they move it to "in progress", others for a time based estimate. Some ask for something like story points. Most do some form of estimate (even though Kanban isn't really heavily into…
-
Velocity is calculated based on sprint data such as start and end, what you planned into it and what you managed to complete during the sprint. Only the "what we did" data is captured in Kanban, so you can't generate a velocity. Average points solved per week, as you say, is possible, but there's no real reporting on it.…
-
Er, it's not "it might be", it's "it does it". JIRA is complex, because of its flexibility. If you're struggling with "column moves = workflow events which lead to notifications" and/or volume of mail, then try working backwards. Start with the notification scheme which says "email these people when event X happens", and…
-
Columns area representation of the workflow for an issue. A card going into a column is just a display of the underlying issue moving into one of the status within that column. So, take a look at the workflow and the notification scheme. To change an issue's status, transitions are used. Transitions all have "fire event"…
-
You could use global transitions - define one that goes from <any state> to <specific state>. The starting point for one of these transisitions is "any status". That would cut it down to 21 transitions!
-
There is no such thing as "overstep". You need to define a transition for each possible change of status, and then use "conditions" to hide transitions that should not be allowed. An example condition here might be "do not allow Risk -> Hardware if the field v-model stations has the value risk-management"
-
Your question does not really make sense, but I'm guessing you mean you have installed JIRA and the database server on the same server. To check if JIRA can see the database server, start by pinging it - in your case, "localhost" will check that link
-
Ok, that looks good, assuming JIRA is in a totally separate database. Now what did you configure for the user directories?
-
You'll need to explain what you have set up and configured. Are the JIRA and Confluence databases totally separate (different schema)? Did you tell Confluence to use JIRA's user directory?
-
It's a global system, individuals get no choice.
-
I'm guessing you are looking at a "create" transition? They can't have conditions because before it completes the transition, there's no issue for it to work with.
-
Ah, the field context I said was right then :-) It's an annoying flaw in Jira. I understand the logic behind it, but it's wrong as far as the end user is concerned, and although I appreciate Atlassian adding a warning about it, it's still not fixed properly.
-
>When I run the query in Issue Navigator, I do not see my custom field Well, that probably answers it. If it's not coming out on the navigator, it's not going to come out in excel. This usually happens when you run a filter that includes issues for which your field is not valid. For example, if project ABC has a field…
-
Which "export" are you using? If it's the Excel one, then it's down to the custom field, and your configuration. First, is the custom field displayed when you run the filter? Even if it's an empty column? If not, then it won't be exported. Secondly, when the Excel export is run, Jira looks at the fields for a reference…
-
Nope. A project can only be in one category. I don't know of any workarounds, unless you use "profields" plugin and add a custom field in there.
-
Correct, they will be a user. You could also open up anonymous access, which won't take a licence up, but will expose the entire project to the world
-
Yes, but you need to unpick the default permission scheme. The default scheme uses a single group (Jira users) to say "can log in" AND "can do stuff in project". You'll need to stop doing that, and have just a group that says "can log in", and nothing else. Change all your permission schemes and roles so that the group is…
-
The administrator rights for Confluence cloud are two layers. You won't get the higher layer, that's reserved for Atlassian support, but the application admin right is controlled by "global permissions" - that names a group, or set of groups for admins. If a user is in one of those groups, they have application admin…
-
That's one that depends on your process and what you want to report on really. If you want to report on a release being packaged by developers, use that date. If it's a production go-live that matters, use that. I sway towards production myself, because the (smattering of) code I write is usually built and packaged by CI…
-
You'll need to change every notification scheme to do that
-
Yes, it is a little odd. There is a quirk with it - if you use it in permissions other than "browse", it can have some very odd effects, including a couple of cases where a user trying to do something with an issue throws JIRA into a loop only fixable by restarting it, so you do need to educate admins to use it with care.…
-
There are two ways to do point a/b. The easier and better one is to enable the "reporter browse" permission, and then have a permission scheme that says "browse project: role(internal developers), reporter-browse". But you can't do that on Cloud, as far as I know. You could raise a request with…