Comments
-
Michael is correct (Y)
-
Try going into Project->Reports-> Forecast & management
-
Ahh I thought he meant changed the sprint by "move". (Y)
-
Glad to hear that :)
-
This looks like a problem with the board filter (or even subfilter). Try checking that first.
-
1-Users need to have access in projects contained by the board filter (check project permissions) 2-Check Board Filter Query (you can easily share it with the mentioned projects above, that way you don't have any missmatch with project permissions)
-
But the sprint field will already be changed ? Maybe worklog created time checking between sprint start/end date will do ?
-
Well if it helps, I use my own "custom templates", empty projects with the desired configuration. And then create new projects with shared configurations. 2 drawbacks: 1-This is not yet available via API as far as I know 2-Shared configuration might not be your use case
-
Still working in JIRA 7.3 1. Stop JIRA. 2. Locate the jira-config.properties file in the $JIRA_HOME directory. If the file does not exist, please proceed to create it. 3. Open the file and add the below on a separate line: jira.export.excel.enabled=true 4. Save this file. 5. Restart JIRA.
-
Disabling , Re enabling the plugin. (in my case updating also) fixed the issue. This bug really should be adressed as it's the 2nd time it has happened in our production system, unpredictably.