Hi,
i am running on bamboo 5.7.2, i run bamboo on one local agent and 2 remote agents. currently my builds distribution is hardcoded i.e i have hardcoded bamboo to run few jobs in default/local agent(bamboo server) and few on 2 remote agents.
1) I do not know what exactly is master slave concept of jenkins but ppl talk a lot about it, so can we do that in bamboo? if yes could you explain in detail?
2) my intention is if i have 10 jobs running out of which if the 5th job takes 50 minutes to run and 3.4th takes 5 mins to run each, then bamboo should run the long job i.e 5th on the default agent and remaining should be distributed on the remote. can this be possible?