Hi Atlassian community,
i have a repo, the repo has two build plans X and Y.
X is the normal build plan which tells me that the build for the repo is successful. I want this reflected in bitbucket pull requests.
Y is a small task that runs every 15 minutes and is not related to the build status of the repo.
My problem is that if a PR for the repo is raised and Y is run and succeeds, it looks as if the PR has been successfully built.
How can I ignore the build status from Y ?