I'm working to integrate clover with our existing bamboo build to do better reporting of the unit test results. As we all know, the clover build needs to be "separated" from the production build because of the instrumentation injected into the class files.
Does nay one have any "best practices" as to how that should be mapped into the Bamboo plan structure? E.g. Run a job for the test builds, then a separate job for the "production" build and deploy, or other setups to the "clover enabled plan".