Hello,
I have several plans, each one run manually as "customised build", where we can select which stages we are going to run.
I need to create another plan, that will run all these plans with an specific stage (this must be a parameter, chosen by the user during a manual run).
This plugin was recommended in a thread, however I didn't find a way to pass a specific stage.
Is there a way to achieve this with Bamboo?