Hi all,
the Portfolio field "Parent Link" is locked so it is available for all issue types, I cannot change that.
So I put it only on the Epic Screens - ok so far.
Problem: When user change the issue type from Epic to Saga (Moving an issue), the field field Parent Link is not updated, as it is also available for issue type saga. A user is not even able to map it during the move process, it just does not show up at all during move.
Bad Consequence: We have Sagas in our instance which have a parent link to another saga. This should not be possible and and leads to problems. Even Jira prompts this inconsistency with a Warning in the issue search, see screenshot "This link is inconsistent with your Portfolio hierarchy"
Any ideas if this is works as designed and what can be done to prevent that?
