I have a build plan with a stage that consists of multiple jobs, which are distributed over multiple agents. Sometimes one of these jobs fails, but will succeed if we restart it the job.
However: the failing job can only be restarted after all the other jobs have finished. The Run > Rerun all failed Jobs option is not visible until all jobs have finished.
Is there a way to restart this failing job while the other jobs are still running? In the case that a short-running job fails, and other long-running jobs are still running, ideally the failing job would be restarted. In our case, the restarted job would succeed before the long-running job would.