I originally asked the question on Stack Overflow, but I think I can get a better answer here. Here's the original question:
http://stackoverflow.com/questions/10459130/how-do-i-run-just-a-single-stage-in-my-bamboo-build
I have a bamboo build with 2 stages: Build&Test and Publish. The way bamboo works, if Build&Test fails, Publish is not run. This is usually the way that I want things.
However, sometimes, Build&Test will fail, but I still want Publish to run. Typically, this is a manual process where even though there is a failing test, I want to push a button so that I can just run the Publish stage.
In the past, I had two separate plans, but I want to keep them together as one. Is this possible?