I can't get the default trigger condition : Only run Build if other Plans are currently passing to work on my manual plans.
I setup a manual build strategy with a trigger condition pointing to a top level plan - I made sure the last build on the other plan had failed and then requested a build on the current plan. The plan still gets executed without checking the other plan status.
As a side note, I did not set any dependencies between the 2 plans - other than speficying the plan key.
I opened a BAM defect ticket (since it's blocking our builds), but I was wondering it it worked for you.