Hi,
We use the same configuration and mapping between JPD and Jira Software mapping as the user https://community.atlassian.com/forums/Jira-Product-Discovery-questions/Delivery-progress-counting/qaq-p/2927099
Basically, for each Hub Idea, we have an Initiative with Epics underneath linked to it to track the Delivery Progress.
My problem is the delivery tracker doesn't take into account any progress in the children tickets (ie stories) so
If we link an Initiative to an idea, JPD will only look one level down (to Epics).
It will not consider the Stories under those Epics when calculating progress.
To get story‑level accuracy today, we would have to:
Either link Epics and/or Stories directly to the idea, which creates a lot of manual overhead and noise in the Delivery tab.
Or accept that Delivery progress reflects only initiative→epic status, which is too coarse for some use cases.
We don't add up story points on the epics and we don't want to start doing that.
Is there a way to se up the Delivery progress field to look two levels down when counting work items?