Is there a way to check which user triggered manual stage in Bamboo? I can't find that info anywhere.
Many thanks!
Greg
Grzegorz,
In bamboo go to the build result and select the Job for the manual stage. THen on the MetaData tab you should see a field "ManualBuildTriggerReason.userName" with a value on the right of the username who actually ran the manual stage.
Adam
Hmm, thanks for your answer but that's only partially true.
It is true when the whole plan was triggered manually (by clicking on "Run" button). However, my case is different:
In my plan there are two stages:
* first stage is triggered by SVN change. I don't run it manually.
* the second stage is a manual stage - it requires a user to click on "Run" button.
The problem is that when the first stage is triggered automatically by SVN commit and after that a user starts the second stage manually - I can't find out who started it. There's no "ManualBuildTriggerReason.userName" key in jobs' metadata.
Could it be a bug/missing feature?
What specific version of Bamboo are you using?
Just upgraded to 4.4.3 (build 3505)
It looks like you're new here. Sign in or register to get started.