A really useful feature in Bamboo would be the ability to checkpoint plan configurations so that plan changes could be undone if the turned out to be problematic. Even better, the ability to create a tentative change to the plan configuration, try it out, and the accept it if everything works. Basically, we are looking for some kind of revision control on the plan configuration, but we're not sure how to get it without Bamboo supporting it directly.
Thanks