Every month there is a unique checklist that needs to be completed. The checklist needs to be added to at least 19 cards on a board that are identified with a specific label.
I know I can create the checklist on one of those card, then go into the subsequent 18 and copy it but I'm hoping there is an easier way.
I looked at a bulk action power-up but checklists were not included and I can't figure out a way to do it with butler because there is not a 'trigger action' on the other 18 cards