When a Build contains a manual stage, the build duration is not calculated correctly.
This is reproducible on Data Center:
Steps to Reproduce
- Add a manual stage to a build that has known build duration.
- Run the build.
- Wait 10 minutes before triggering the manual stage.
- Trigger the manual stage.
in the above scenario the queue time are considered negligible.
Expected Results
The build should have the previous build duration + 10 minutes
Actual Results
The build the build duration is much higher.
Workaround
Currently there is no known workaround for this behavior.
It ha been opened a bug https://jira.atlassian.com/browse/BAM-21817
If you think that is important, please vote it because it affect the value that you see on the UI