I have a bamboo plan with stages 1, 2 and 3, that run in that order.
I expect stage 1 and stage 2 to fail and stage 3 to succeed. This to me is a successful build.
I expect stage 1 and stage 2 to fail but if stage 3 fails, then this to me is a failed build.
In both the above scenarios, bamboo shows the build as a failed build (indicated in red).
Is there anyway to over-ride the build status and show the first scenario (i.e. expect stage 1 and stage 2 to fail and stage 3 to succeed), as a successful build (indicated in green) (my user base seeing red will assume there is something wrong when there may not necessarily be)?