I have tried creating a task under a plan by selecting the "Executable" option as uipath studio. Attaching the logs for reference.
https://bamboo.corp.uber.internal/download/IACOE-IACOETESTING2020-JOB1/build_logs/IACOE-IACOETESTING2020-JOB1-19.log
@Vinay Nallari, the link you shared is not working, can you please share accessible link.
It looks like you're new here. Sign in or register to get started.