i created this command:
when the "Ordem de Produção" item is checked in a checklist named "Estágio da Obra", copy the card to the top of list "ORDEM DE PRODUÇÃO" on board "PRODUÇÃO" and link the cards together, move the card to the top of list "PRODUÇÃO", and copy the card to the top of list "OBRAS" on board "ESTOQUE" and link the cards together
the card is copied, linked, but not connected with the original card.
I can not see the copied card attached at the original card, but i can see the original card attached at the copied card.
and i want to be able to see both ways automatic.