Create
cancel
Showing results for 
Search instead for 
Did you mean: 
Sign up Log in

Missing "assignee" drop down in an existing project

Rita Depp
I'm New Here
I'm New Here
Those new to the Atlassian Community have posted less than three times. Give them a warm welcome!
September 9, 2019

I added a new task to an existing project and am unable to assign it to a developer because the "assignee" drop down option is no longer available. I do not have administrator permissions to add it back. How can I retrieve it for a new task in an existing project?

1 comment

Nic Brough -Adaptavist-
Rising Star
Rising Star
Rising Stars are recognized for providing high-quality answers to other users. Rising Stars receive a certificate of achievement and are on the path to becoming Community Leaders.
September 11, 2019

Check you have the permission for "assign issue" (not the same as "assignable user") first.  If you have it, then you'll need an admin to add the field back to the sceen, or un-hide it.

Comment

Log in or Sign up to comment
TAGS
AUG Leaders

Atlassian Community Events