Hello guys, I have been looking for a config in EazyBI for a while now without success. I need a way to calculate the average time issues stay in a specific status, like: Bar 1 = Number of i...
I am trying to create a chart has labels as a dimension and limit the reported dimension with additional label(s). i.e. number of tickets that have both label1 AND label2 over time. I've tried...
I'm just getting started with EazyBI. I've created a report which uses labels as a Dimension. This works fine. However, I want to limit the reported dimension to only include labels that start with t...
Hello eazyBI team! Is it possible to EXCLUDE issues from the report result based on the labels dimension? I know how to INCLUDE issues with particular label/labels in the report. All I need is to p...
I'd like to create a calculated measure that shows the average velocity of the sprints displayed in my chart. For example, in the attached image, a fourth column would show that the velocity across a...
Hello there guys, Is there a way in EazyBI I can create a table with all the epics, and I would be able to click que plus button and see all the issues linked to it? Kind regards.
I'm using a lot the option to drop-down the week number to populate the report's data with. eazybi wwekly.PNG However, in dashboards with multiple reports of this kind it could be very useful...
Hi I am trying to do the following either in JIRA itself or using eazyBI Take two custom fields: Field1 Field2 Total 2 1 &n...
Hello! I have issues linked to Epics with a custom field for Amount (numeric value). I want report the Total Sum of all Amounts by Epic. I've got a report configured to show all Epics and dri...
Hello guys, I have been trying to create the following report. The tasks moved from statuses "a,b,c,d" to status "z", without due date change or that the due date was changed, but for le...
Hi, I want to create a report which is grouped by Status and want to show the number of links to that issues.
Hi, a colleague of mine needs sort of a hard/crazy report with eazyBI. The fact aside that eazyBI already gives you the option to check for days in transition status and days in status as separate r...
Hi all, I'm pretty new in eazyBI and I guess my request is very simple. I defined a calculated members in Columns's Measures like below to create a curve of issue total. This looks fine. Howeve...
Hi All, Simple question that puzzles me: I want to arbitrary group several dimension members (for example ticket reporters). I do it frequently with MS Excel, but I have absolutely no clues on how t...
Hi guys, I'm using Sprints as a page in one of my reports, but I want to create a way to only make the issues in an Open Sprint to show up. How do I do that? Is that with Calculated Members? What ...
Hi, I have epics with 'Planned Start' and 'Planned End' set. In eazyBi I have 'Epic Link' in 'Rows' and 'Measures->Calculated Members->Issue Planned Start/End' in 'Columns'. Eventually I ...
Hi eazyBI team! I am pretty sure this is easy one, but I cannot get it done. My report has Issue dimension in Rows section. So it displays issues in lines. Columns shows Days in transition status m...
Hi, Is it possible to change a colour based on the cell value of a report? As in, say in a report the values greater than 5 should be coloured red. Selecting a colour is possible in pie , line and ...
I've already followed the guidance shown here: https://answers.atlassian.com/questions/38045182/eazybi---how-to-load-report-with-current-week-by-default However I can't get this broken down by day....
A particular sprint's Velocity Chart Report shows 41 story points committed and 29 story points completed. When I create a report in EazyBI, EazyBI shows 31 story points committed and 26 story points...
Is there a way to show issues in a report in the following structure Epic>>>Story>>>Subtask
I simply want to create customer Calculated Member in the Time dimension to focus only on subset of dates. I know I can filter on the Timeline x-axis via the "between" mechanism, but the issue ...
I'd like a report to be generated and sent, via email, on a regular basis. Is there a way to accomplish this?
Hi! In Eazy BI we have measure (issue property) calles "Issue status updated date" and it looks like [Issue].CurrentMember.get('Updated at') Now, I'd like to get another information: the exa...
Hello! I need to get latest test execution to watch status of whole test. For example: I have some testers which has his own test Cycle. In each cycle tests could repeat between cycles. (Tester 1...
Copied to clipboard